LCRF

Privacy preferences

Choose optional purposes independently. You can change or withdraw your choice at any time from the footer.

Strictly necessary

Required for security, session functions and storing your privacy choice.

Always active
Preferences

Remembers optional display or language settings when these features are enabled.

Analytics

Uses first-party visitor and session identifiers to measure pages, referrals and inquiry interactions.

Marketing

Allows marketing measurement or third-party advertising technologies if they are introduced in the future.

Passive RF Network Engineering

Why must a passive RF impedance network have a defined reference plane and complex S-parameters?

The reference plane determines where impedance and waves are defined; complex S-parameters retain magnitude and phase needed to move planes, de-embed fixtures and predict network interaction.

A connector, cable, adapter, fixture and PCB launch each transform the measured impedance. Naming the reference plane tells the supplier and test laboratory exactly where return loss, insertion response and power apply. Without it, two measurements can both be correct yet disagree because they include different interconnects.

Complex S-parameters retain magnitude and phase for every declared port. They support de-embedding, plane extension, time-domain inspection and circuit simulation. Scalar VSWR or insertion-loss values cannot reproduce those operations or reveal the same interaction between a network and its source and load.

Document calibration method and standards, reference impedance, connector condition, port state, fixture model, frequency grid, power level, temperature and uncertainty. Keep the native touchstone file with serial and revision traceability.

Engineering inquiry

Share your RF requirement

Share the product, operating requirements and project context. Our engineering team will route your request to the right specialist.

AttachmentsAttach drawings, BOMs, specifications or test files. Up to 5 files, 10 MB each and 25 MB total.
or drag and dropPDF, DOCX, XLSX, CSV, TXT, JPG, PNG, S1P and S2P