LCRF

Privacy preferences

Choose optional purposes independently. You can change or withdraw your choice at any time from the footer.

Strictly necessary

Required for security, session functions and storing your privacy choice.

Always active
Preferences

Remembers optional display or language settings when these features are enabled.

Analytics

Uses first-party visitor and session identifiers to measure pages, referrals and inquiry interactions.

Marketing

Allows marketing measurement or third-party advertising technologies if they are introduced in the future.

RF Antenna Engineering

How should linear, circular, axial-ratio and cross-polarization requirements be specified?

Define linear orientation or circular sense, the viewing and coordinate convention, axial ratio, cross-polar limits and the frequency and angular region where they apply.

For a linearly polarized antenna, state the orientation relative to the installed coordinate system and the permitted cross-polar response. For circular polarization, state RHCP or LHCP with the agreed viewing convention. Axial ratio indicates how close the polarization ellipse is to a circle; it must be limited over the required frequency and angular region, not only at boresight.

Cross-polar discrimination compares desired and orthogonal polarization responses under a declared basis. It is distinct from isolation between two feed ports. Dual-linear and dual-circular designs may require both port isolation and pattern-level cross-polar limits.

Polarization mismatch reduces received power and can vary with platform attitude, reflection and radome effects. Include the operational orientation, angular coverage, radome and representative installation in verification.

Engineering inquiry

Share your RF requirement

Share the product, operating requirements and project context. Our engineering team will route your request to the right specialist.

AttachmentsAttach drawings, BOMs, specifications or test files. Up to 5 files, 10 MB each and 25 MB total.
or drag and dropPDF, DOCX, XLSX, CSV, TXT, JPG, PNG, S1P and S2P
Typically reviewed within one business dayProject information is handled confidentially