LCRF

Privacy preferences

Choose optional purposes independently. You can change or withdraw your choice at any time from the footer.

Strictly necessary

Required for security, session functions and storing your privacy choice.

Always active
Preferences

Remembers optional display or language settings when these features are enabled.

Analytics

Uses first-party visitor and session identifiers to measure pages, referrals and inquiry interactions.

Marketing

Allows marketing measurement or third-party advertising technologies if they are introduced in the future.

RF Filter and Duplexer Engineering

What is the difference between RF filter insertion loss and return loss?

Insertion loss measures transmission reduction through the intended path; return loss measures mismatch at a port under defined terminations, so both are needed.

Insertion loss is the reduction in transmitted power through the intended path, while return loss describes how much incident power is reflected at a port. They are related through the network but are not interchangeable and must be specified at the same reference planes, impedance and termination state.

A receiver filter with low return loss may create standing waves and gain ripple even if its forward loss appears acceptable. A well-matched filter can still have excessive dissipative loss, reducing delivered transmitter power or adding directly to receiver noise figure when placed ahead of the LNA. Reject averages that hide a passband edge peak.

Provide passband edges, maximum S21 loss and ripple, minimum S11/S22 return loss, connector planes, temperature, power and unused-port terminations. Verify with calibrated S-parameters and preserve both measured and de-embedded data when fixtures are removed.

Engineering inquiry

Share your RF requirement

Share the product, operating requirements and project context. Our engineering team will route your request to the right specialist.

AttachmentsAttach drawings, BOMs, specifications or test files. Up to 5 files, 10 MB each and 25 MB total.
or drag and dropPDF, DOCX, XLSX, CSV, TXT, JPG, PNG, S1P and S2P
Typically reviewed within one business dayProject information is handled confidentially