LCRF

Privacy preferences

Choose optional purposes independently. You can change or withdraw your choice at any time from the footer.

Strictly necessary

Required for security, session functions and storing your privacy choice.

Always active
Preferences

Remembers optional display or language settings when these features are enabled.

Analytics

Uses first-party visitor and session identifiers to measure pages, referrals and inquiry interactions.

Marketing

Allows marketing measurement or third-party advertising technologies if they are introduced in the future.

Navigation, Timing and Positioning Engineering

How should PPS and 10 MHz timing-distribution delay and skew be verified?

Verify every delivered timing channel at its real load by separating fixed calibrated delay, channel skew, environmental drift, output level, edge or phase behavior and path-dependent uncertainty.

Define each output by waveform, nominal frequency, level, impedance, connector, load, edge rate or phase-noise requirement and simultaneous fan-out state. Measure at the consumer connector with the actual cable and termination. A receiver's internal timing specification does not include an unmeasured distribution amplifier, splitter or field cable.

Separate absolute path delay from relative channel skew. Calibrate or characterize antenna-cable delay, receiver processing delay and each distribution path when absolute time matters. For relative synchronization, verify channel-to-channel delay, phase or edge repeatability, load sensitivity, crosstalk and temperature drift. Store per-channel compensation with serial and revision identity.

Use a time-interval counter, phase comparator or suitable oscilloscope against a reference whose uncertainty supports the limit. Test warm-up, all active outputs, cable replacement, temperature, power cycling and reference reacquisition. Retain raw phase or time data, instrument configuration, uncertainty and alarm state so the delivered timing claim can be reconstructed.

Engineering inquiry

Share your RF requirement

Share the product, operating requirements and project context. Our engineering team will route your request to the right specialist.

AttachmentsAttach drawings, BOMs, specifications or test files. Up to 5 files, 10 MB each and 25 MB total.
or drag and dropPDF, DOCX, XLSX, CSV, TXT, JPG, PNG, S1P and S2P
Typically reviewed within one business dayProject information is handled confidentially