LCRF

Privacy preferences

Choose optional purposes independently. You can change or withdraw your choice at any time from the footer.

Strictly necessary

Required for security, session functions and storing your privacy choice.

Always active
Preferences

Remembers optional display or language settings when these features are enabled.

Analytics

Uses first-party visitor and session identifiers to measure pages, referrals and inquiry interactions.

Marketing

Allows marketing measurement or third-party advertising technologies if they are introduced in the future.

RF Test and Measurement Engineering

Should a switch matrix, probe and fixture be inside or outside the calibrated RF reference plane?

Place hardware inside the corrected plane only when its full routed state can be calibrated or characterized; otherwise report its contribution explicitly and control it as part of the measured path.

Draw the path from the instrument port to the DUT and mark each cable, adapter, switch state, conditioning element, probe and fixture transition. A standard calibration removes only the errors between the instrument and the plane where its standards are connected; downstream hardware remains in the result unless a different calibration or validated correction moves the plane.

A switch matrix can be included only when the routed state, unused-port condition, repeatability, isolation, level and correction data are controlled. A probe or fixture can be removed only when its electrical model matches the delivered geometry and the de-embedding method has passed an independent quality check over the required band.

State the final reported plane with a physical datum and retain the calibration, path state and fixture or probe revision. If the chain changes after calibration, measure the check standard again or recalibrate; naming the result at the DUT does not compensate for an undocumented transition.

Engineering inquiry

Share your RF requirement

Share the product, operating requirements and project context. Our engineering team will route your request to the right specialist.

AttachmentsAttach drawings, BOMs, specifications or test files. Up to 5 files, 10 MB each and 25 MB total.
or drag and dropPDF, DOCX, XLSX, CSV, TXT, JPG, PNG, S1P and S2P
Typically reviewed within one business dayProject information is handled confidentially